RM70.37M Win: Kawan Renergy Berhad is powering Malaysia’s digital future!
We’ve secured a major contract to supply critical diesel generator systems for a premier data centre in Peninsular Malaysia, with delivery targeted by 17 April 2027.
By integrating backup energy solutions, we are ensuring the 24/7 reliability and resilience required for today’s mission-critical digital infrastructure.
This milestone reinforces our position in delivering high-performance backup power systems for the fast-growing data centre sector in Malaysia.
hashtag#datacentre hashtag#KawanGreenEnergy hashtag#BackupPower
Read the full story here: https://lnkd.in/gT6TXdHa